Sleeper Layer Control System for Queensland Rail

2008-2013

  •  able to place 15 sleepers / minute
  •  mobile hydraulics controlled by Omron PLC
  •  extensive diagnostics via dual HMI
  •  remote connection through mobile network for troubleshooting support
  •  secure VPN on remote connection – final commissioning via remote connection